Sensitivity and model error
Ask how much a decision changes when an uncertain input moves.
12 minutes · intermediate · Original Poker4Quant lessonWhat you will learn
Evaluate call EV over a probability range and distinguish arithmetic from estimation error.
Prerequisites: Ties and shared pots · Risk budgets in a toy model
A linear model has a transparent slope
For a no-tie final call, EV(q)=q(P+C)−C. Changing q by Δq changes EV by (P+C)Δq when P and C are fixed. Write percentage changes as decimals: one percentage point is 0.01.
With P=150 and C=50, the slope is 200 chips per probability unit, or 2 chips per percentage point. The threshold remains 25%. Inputs close to the threshold can make small estimation errors decision-relevant even when the arithmetic is exact.
A plausible interval is not automatically a confidence interval
A stated range of plausible probabilities is a scenario assumption unless it comes from a justified statistical procedure. Evaluate endpoints to see whether the EV sign is robust across that range, but do not invent a probability that q lies inside it.
Holding every other input fixed isolates one source of sensitivity. In a real model, probability, bet sizing, fees and future behavior may move together. A clean derivative or endpoint check does not validate those relationships; it helps identify which assumptions deserve more attention.
Worked example
P=150 and C=50. Estimated q=30%, with a plausible scenario range 20%–35%. What does the call model imply?
- EV(0.30)=0.30×200−50=10.
- EV(0.20)=40−50=−10.
- EV(0.35)=70−50=20.
- The range crosses the 25% threshold, so the sign is sensitive to q.
The point estimate gives +10, but the stated scenarios span −10 to +20. Better arithmetic cannot resolve uncertainty about the input estimate.
Common mistakes
- Using 1 instead of 0.01 for a one-percentage-point change.
- Labeling an arbitrary scenario range a statistical confidence interval.
- Treating one-input sensitivity as a complete joint model validation.
Keep these ideas
- Expose the input-to-payoff relationship.
- Check endpoints against the decision threshold.
- Separate computation precision from model evidence.